Energy construction, engineering & design
Hydro power plants

- Design and engineering
- Site investigation
- Geology & geodesy
- Hydrology
- Environmental assessment
- Feasibility Study
- Construction
- Main and auxiliary equipment installation
- Electrical equipment
- Control system
- Construction monitoring
- Maintenance
- Upgrade and rehabilitation
- Testing commissioning
Thermal power plants
- Design and engineering
- Site investigation
- Geology & geodesy
- Environmental assessment
- Feasibility Study
- Construction
- Main and auxiliary equipment installation
- Electrical equipment
- Control system
- Construction monitoring
- Maintenance
- Upgrade and rehabilitation
- Testing and commissioning


High, medium and low voltage substations and transmission lines

Transmission networks construction and rehabilitation experience including 110, 220, 330 and 500 kV substations and transmission lines and 110 and 220 kV electric networks
Total length of all kinds of constructed lines by Azenco is over 1,200 km
Total length of all kinds rehabilitated transmission lines is about 5,000 km
- Design and engineering
- Site investigation
- Geology & geodesy
- Environmental assessment
- Feasibility Study
- Tower installation
- Wiring and cabling
- Control system
- Testing and commissioning
- Maintenance
- Upgrade, rehabilitation and extension

Civil construction


- Building design & engineering
- Area grading & paving
- Water supply and sanitation systems
- Power and communication facilities
- Landscaping
- Building renovation
Design and construction of industrial buildings


Diagnostics and testing services


Diagnostics and testing services for power plants


Procurement and supply services

