Mingechevir – Varvara hydro power plants rehabilitation project

Country: Azerbaijan, Mingechevir city

Nature of contract: replacement of hydro-turbines Nos. 1 and 3 and related electrical and hydro equipment

Azenco’s scope of work: Contractor

  • Nature of contract: replacement of hydro-turbines Nos. 1 and 3 and related electrical and hydro equipment
  • Upgrade of automation system
  • Rehabilitation of 16,5 MW Varvara HPP

Yenikand hydropower plant

Installed capacity — 150 MW

Construction period — 1995-2000

Azenco’s scope of work: Contractor

  • Replacement of hydro-turbines 1 & 3 and related electric & hydro equipment
  • Upgrade of automation system
  • Rehabilitation of 16.5 MW Varvara HPP (part of the Mingachevir HPP cascade)

Fuzuli hydropower plant

Installed capacity — 25.2 MW

Construction period — 2008-2012

Country: Azerbaijan

  • Engineering and design
  • Procurement and supply & Installation of equipment
  • Construction of building & facilities, testing & commissioning

Qusar-1 SHPP

Installed capacity — 1 MW

Average annual generation — 5.4 m’kWh

Commission date — 2012

AZENCO’s scope of work — EPC contractor

Ismayilli-1 SHPP

Installed capacity — 1.6 MW

Average annual generation — 7.9 m’kWh

Project description — SHPP construction

Commission date — 2013

AZENCO’s scope of work — EPC contractor